{"id":"f7dc7a6b-93c0-4bd6-9af4-2a6cda487db6","slug":"clawhub-archlab-space-eight-d-corrective-action-report","name":"Eight D Corrective Action Report","description":"Use this skill when a quality engineer, supplier-quality engineer, or manufacturing engineer needs to draft an 8D corrective action report for a nonconforman...","canonicalUrl":"https://www.xpersona.co/agent/clawhub-archlab-space-eight-d-corrective-action-report","sourceUrl":"https://clawhub.ai/archlab-space/eight-d-corrective-action-report","homepage":"https://clawhub.ai/archlab-space/skills/eight-d-corrective-action-report","source":"CLAWHUB","vendor":{"slug":"clawhub","label":"Clawhub","url":"https://clawhub.ai/archlab-space/skills/eight-d-corrective-action-report"},"protocols":["OPENCLEW"],"capabilities":[],"trustScore":null,"trustConfidence":"unknown","artifactCount":0,"benchmarkCount":0,"lastRelease":"0.1.2","freshnessAt":"2026-10-11T22:53:39.648Z","freshnessLabel":"Oct 11, 2026","securityReviewed":true,"openapiReady":false,"stats":[{"label":"Trust score","value":"Unknown"},{"label":"Compatibility","value":"OpenClaw"},{"label":"Freshness","value":"Oct 11, 2026"},{"label":"Vendor","value":"Clawhub"},{"label":"Artifacts","value":"0"},{"label":"Benchmarks","value":"0"},{"label":"Last release","value":"0.1.2"}],"factsPreview":[{"factKey":"vendor","category":"vendor","label":"Vendor","value":"Clawhub","href":"https://clawhub.ai/archlab-space/skills/eight-d-corrective-action-report","sourceUrl":"https://clawhub.ai/archlab-space/skills/eight-d-corrective-action-report","sourceType":"profile","confidence":"medium","observedAt":"2026-10-11T22:53:39.661Z","isPublic":true},{"factKey":"protocols","category":"compatibility","label":"Protocol compatibility","value":"OpenClaw","href":"https://www.xpersona.co/api/v1/agents/clawhub-archlab-space-eight-d-corrective-action-report/contract","sourceUrl":"https://www.xpersona.co/api/v1/agents/clawhub-archlab-space-eight-d-corrective-action-report/contract","sourceType":"contract","confidence":"medium","observedAt":"2026-10-11T22:53:39.661Z","isPublic":true},{"factKey":"traction","category":"adoption","label":"Adoption signal","value":"981 downloads","href":"https://clawhub.ai/archlab-space/eight-d-corrective-action-report","sourceUrl":"https://clawhub.ai/archlab-space/eight-d-corrective-action-report","sourceType":"profile","confidence":"medium","observedAt":"2026-10-11T22:53:39.661Z","isPublic":true},{"factKey":"latest_release","category":"release","label":"Latest release","value":"0.1.2","href":"https://clawhub.ai/archlab-space/eight-d-corrective-action-report","sourceUrl":"https://clawhub.ai/archlab-space/eight-d-corrective-action-report","sourceType":"release","confidence":"medium","observedAt":"2026-05-28T09:49:27.714Z","isPublic":true},{"factKey":"handshake_status","category":"security","label":"Handshake status","value":"UNKNOWN","href":"https://www.xpersona.co/api/v1/agents/clawhub-archlab-space-eight-d-corrective-action-report/trust","sourceUrl":"https://www.xpersona.co/api/v1/agents/clawhub-archlab-space-eight-d-corrective-action-report/trust","sourceType":"trust","confidence":"medium","observedAt":null,"isPublic":true}],"highlights":["981 downloads","Trust evidence available"],"agentCard":{"name":"Eight D Corrective Action Report","description":"Use this skill when a quality engineer, supplier-quality engineer, or manufacturing engineer needs to draft an 8D corrective action report for a nonconforman...","source":"CLAWHUB","sourceId":"clawhub:s176qz6rwtpzj9gk93r7b3jm6984ty2d:eight-d-corrective-action-report","homepage":"https://clawhub.ai/archlab-space/skills/eight-d-corrective-action-report","repository":"https://clawhub.ai/archlab-space/eight-d-corrective-action-report","documentation":"https://www.xpersona.co/agent/clawhub-archlab-space-eight-d-corrective-action-report","protocols":["OPENCLEW"],"examples":[{"kind":"example","language":"text","snippet":"# 8D Corrective Action Report — DRAFT\n\n**Report No.:** [TBD by user]\n**Customer / Receiver:** [name]\n**Part No. / Program:** [part], [program]\n**Defect Mode:** [single mode]\n**Issued:** [today's date]\n**Status:** DRAFT — requires sign-off by Quality Engineer of Record and Customer-Quality counterpart before transmittal\n\n---\n\n## D0 — Emergency Response Action\n[ERA description, owner, effective-from datetime, qty scope — or \"N/A\"]\n\n## D1 — Team (by role)\n- 8D Champion: [role]\n- Quality Engineer: [role]\n- Process Owner: [role]\n- Operator / Inspector: [role]\n- Design / SQE: [role, if applicable]\n- Customer-Quality counterpart: [role]\n\n## D2 — Problem Description (Is / Is-Not)\n| Dimension | Is | Is-Not | Source |\n| --- | --- | --- | --- |\n| What | | | |\n| Where | | | |\n| When | | | |\n| How much | | | |\n| Who | | | |\n\n## D3 — Interim Containment Action\n| Location | Method | Owner | Start | Qty | Effectiveness |\n| --- | --- | --- | --- | --- | --- |\n[rows; flag any open containment gap]\n\n## D4 — Root Cause\n\n### Technical (Occurrence) — 5-Why\n| # | Why | Evidence Type | Status |\n| --- | --- | --- | --- |\n[rows]\n\n### Systemic (Detection / Escape) — 5-Why\n| # | Why | Evidence Type | Status |\n| --- | --- | --- | --- |\n[rows]\n\n## D5 — Permanent Corrective Action\n| Cause | Action | Owner | Target Date | Effectiveness Criterion |\n| --- | --- | --- | --- | --- |\n[rows]\n\n## D6 — Implementation Evidence Required\n- [evidence item per D5 action]\n\n## D7 — Systemic Preventive Action\n- PFMEA update: [line item, new RPN target]\n- Control plan update: [revision to be issued]\n- Lessons-learned share: [audience, channel, date]\n- Read-across: [parts/processes evaluated, outcome]\n\n## D8 — Closure\n- Closure date and approver (role): [date / role]\n- 6-month effectiveness check: [date, metric]\n- 8-month effectiveness check: [date, metric]\n\n## Open Items and Assumptions\n- [Asserted causes still missing evidence]\n- [Unknown Phase 1 inputs]\n- [Containment gaps still open]"},{"kind":"example","language":"text","snippet":"# 8D Corrective Action Report — DRAFT\n\n**Report No.:** [TBD by user]\n**Customer / Receiver:** [name]\n**Part No. / Program:** [part], [program]\n**Defect Mode:** [single mode]\n**Issued:** [today's date]\n**Status:** DRAFT — requires sign-off by Quality Engineer of Record and Customer-Quality counterpart before transmittal\n\n---\n\n## D0 — Emergency Response Action\n[ERA description, owner, effective-from datetime, qty scope — or \"N/A\"]\n\n## D1 — Team (by role)\n- 8D Champion: [role]\n- Quality Engineer: [role]\n- Process Owner: [role]\n- Operator / Inspector: [role]\n- Design / SQE: [role, if applicable]\n- Customer-Quality counterpart: [role]\n\n## D2 — Problem Description (Is / Is-Not)\n| Dimension | Is | Is-Not | Source |\n| --- | --- | --- | --- |\n| What | | | |\n| Where | | | |\n| When | | | |\n| How much | | | |\n| Who | | | |\n\n## D3 — Interim Containment Action\n| Location | Method | Owner | Start | Qty | Effectiveness |\n| --- | --- | --- | --- | --- | --- |\n[rows; flag any open containment gap]\n\n## D4 — Root Cause\n\n### Technical (Occurrence) — 5-Why\n| # | Why | Evidence Type | Status |\n| --- | --- | --- | --- |\n[rows]\n\n### Systemic (Detection / Escape) — 5-Why\n| # | Why | Evidence Type | Status |\n| --- | --- | --- | --- |\n[rows]\n\n## D5 — Permanent Corrective Action\n| Cause | Action | Owner | Target Date | Effectiveness Criterion |\n| --- | --- | --- | --- | --- |\n[rows]\n\n## D6 — Implementation Evidence Required\n- [evidence item per D5 action]\n\n## D7 — Systemic Preventive Action\n- PFMEA update: [line item, new RPN target]\n- Control plan update: [revision to be issued]\n- Lessons-learned share: [audience, channel, date]\n- Read-across: [parts/processes evaluated, outcome]\n\n## D8 — Closure\n- Closure date and approver (role): [date / role]\n- 6-month effectiveness check: [date, metric]\n- 8-month effectiveness check: [date, metric]\n\n## Open Items and Assumptions\n- [Asserted causes still missing evidence]\n- [Unknown Phase 1 inputs]\n- [Containment gaps still open]"}]}}