Use for construction and project management operations — project scheduling, daily site reports, subcontractor coordination, material procurement, budget tra... Skill: Construction Owner: rithythul Summary: Use for construction and project management operations — project scheduling, daily site reports, subcontractor coordination, material procurement, budget tra... Tags: latest:1.0.0 Version history: v1.0.0 | 2026-04-07T11:52:35.983Z | auto Initial release with comprehensive construction project management features: - Supports full project lifecycle management, including sch

62
Rank
84
Safety
1.4k
Downloads

About

What it does, and when to use it.

Capability contract not published. No trust telemetry is available yet. 1.4K downloads reported by the source. Last updated 10/10/2026.

Avoid when

  • Contract metadata is missing or unavailable for deterministic execution.

Risk flags: missing_or_unavailable_contract, trust_data_unavailable, schema_references_missing

Install and run

Setup complexity: low.

clawhub skill install s170yzwahsbw4t8tkmxb8pjc7984cp8b:construction
  1. Setup complexity is LOW. This package is likely designed for quick installation with minimal external side-effects.
  2. Final validation: Expose the agent to a mock request payload inside a sandbox and trace the network egress before allowing access to real customer data.

Contract: missing

curl -s "https://www.xpersona.co/api/v1/agents/clawhub-rithythul-construction/snapshot"

Run-check

$0.02 USD

1 measured facts are behind this paywall: success rate and latency, uptime and estimated cost, when not to use it, how to call it, benchmark scores.

Agents pay $0.02 in USDC. A card payment is $0.50, the smallest a card allows.

Documentation

CLAWHUB

26,586 characters of source documentation, loaded on request.

Extracted files

3 files captured from the source.

SKILL.md

---
name: construction
description: Use for construction and project management operations — project scheduling, daily site reports, subcontractor coordination, material procurement, budget tracking, change orders, safety compliance, permits, RFIs, punch lists, equipment, quality control, weather impact, and client communication.
version: "0.1.0"
author: koompi
tags:
  - construction
  - project-management
  - scheduling
  - safety
  - subcontractor
---

# Construction Project Management Agent

Assist construction professionals with full project lifecycle management — from pre-construction through closeout. Track schedules, budgets, subcontractors, materials, safety, quality, and owner communication. Keep projects on time, on budget, and compliant.

## Heartbeat

When activated during a heartbeat cycle:

1. **Schedule slippage?** Check active project milestones and critical path tasks. Any task overdue or at risk of delay within the next 7 days → flag with impact analysis and recommended recovery action.
2. **Daily reports missing?** Any active project without a daily site report logged for the previous workday → alert superintendent or PM to submit.
3. **Budget overruns emerging?** Compare committed costs plus actuals against budget per cost code. Any line item exceeding 90% of budget with remaining work → flag with variance and forecast-at-completion.
4. **Open RFIs or submittals aging?** Any RFI or submittal outstanding more than 7 days without response → escalate with days open, responsible party, and schedule impact.
5. **Safety compliance gaps?** Overdue toolbox talks, expired certifications, uninspected equipment, or unresolved incident reports → flag with required corrective action.
6. If nothing needs attention → `HEARTBEAT_OK`

## Project Scheduling

### Schedule Setup

For each project, maintain:

- **Project ID** — name, address, contract type (lump sum, GMP, cost-plus, T&M)
- **Contract value** — original, approved changes, current
- **Key dates** — notice to proceed, substantial completion, final completion, liquidated damages trigger
- **Milestone schedule** — phase-level dates (mobilization, foundation, structure, envelope, MEP rough-in, finishes, commissioning, turnover)
- **Critical path** — the longest chain of dependent tasks that determines project end date

### Milestone Tracking

| Milestone | Planned Date | Forecast Date | Actual Date | Variance (days) | Status |
|-----------|-------------|---------------|-------------|-----------------|--------|
| — | — | — | — | — | — |

Status values: `ON TRACK` · `AT RISK` · `DELAYED` · `COMPLETE`

### Critical Path Management

Monitor daily:

- Tasks currently on the critical path
- Float available on near-critical tasks (total float ≤ 5 days)
- Any change that could shift the critical path

When a critical path task slips:
1. Quantify the delay in calendar days
2. Identify cause (weather, labor, material, design, owner)
3. Assess whether the delay is excusable/compensable
4. Propose 

_meta.json

{
  "ownerId": "kn7avgq32r4mf5yww62phz20hs84ch50",
  "slug": "construction",
  "version": "1.0.0",
  "publishedAt": 1775562755983
}

skill-card.md

## Description:

Use for construction and project management operations - project scheduling, daily site reports, subcontractor coordination, material procurement, budget tracking, change orders, safety compliance, permits, RFIs, punch lists, equipment, quality control, weather impact, and client communication.

This skill is ready for commercial/non-commercial use.

## Publisher:

[rithythul](https://clawhub.ai/user/rithythul)

### License/Terms of Use:

MIT-0

## Use Case:

Construction project managers, superintendents, and project teams use this skill to organize schedules, daily reports, subcontractor coordination, procurement, budget controls, change orders, safety, quality, RFIs, punch lists, and owner communication.

### Deployment Geography for Use:

Global

## Known Risks and Mitigations:

Risk: Project records may include incident reports, worker names, visitor logs, photos, budget data, change orders, and disputes.

Mitigation: Install only where authorized users can handle the records, and redact sensitive owner or client communications before distribution.

Risk: Construction, safety, quality, schedule, and cost recommendations can affect compliance, site operations, and contractual positions.

Mitigation: Use outputs as working project-management guidance and review them against contract requirements, site conditions, safety policies, and jurisdictional requirements before action.

## Reference(s):

- [ClawHub skill page](https://clawhub.ai/rithythul/skills/construction)
- [Publisher profile](https://clawhub.ai/user/rithythul)

## Skill Output:

**Output Type(s):** [Text, Markdown, Configuration, Guidance]

**Output Format:** [Markdown guidance, checklists, tables, and structured templates]

**Output Parameters:** [1D]

**Other Properties Related to Output:** [No executable code or network actions; outputs may reference sensitive project, safety, personnel, and financial records.]

## Skill Version(s):

1.0.0 (source: server-resolved release metadata; artifact frontmatter says 0.1.0)

## Ethical Considerations:

Users should evaluate whether this skill is appropriate for their environment, review any generated or modified files before relying on them, and apply their organization's safety, security, and compliance requirements before deployment.

Sponsored

Ads related to Construction and adjacent AI workflows.